Project Description
Siegel Construction provided construction management services for Montrose Dental Group, a general dentistry practice, located in Chicago, IL. Their new office is located within a building composed of two individually built structures- one that was built in the 1980’s and the other segment of the building was completed in the 1990’s. Their practice includes 6 operatories, sterilization, laboratory, x-ray, and a staff lounge. The project was completed and delivered on time and within budget.
In the pre-construction phase Siegel provided:
- Project budgeting services
- Project scheduling
- Constructability review
- Interior design services
- Preparation of construction documents
- Design quality assurance throughout the design process
- Legal Documents Coordination
The construction phase includes:
- Schedule Review
- Budget Review
- Change order review
- Site logistics
- Inspections and trades coordination
- Cabinetry and equipment install coordination
- Financial reports and final document coordination
- Building management coordination
- Interior Design Quality Assurance
- Contract Payment Administration
- Cost Control
- Management Reporting
- Insurance Administration
- Warranty Management
Post Construction:
- Ongoing Facility Management
- Collect facilities manual – Siegel Manual
- Warranty management